|
|
 |
Driver Information |
 |
| |
| Manufacturer: |
IBM |
| Operating System: |
Windows 2000/XP |
| Version: |
8.133.2-050525a-024243C |
| Release Date: |
2005-08-11 |
| Category: |
notebook Driver |
| File Name and Size: |
1rd633ww.exe(30.55 Mb) |
| Model: |
ThinkPad R50/R50p |
| Description: |
IBM ThinkPad ATI Radeon/FireGL Video Driver 8.133.2-050525a-024243C Windows 2000/XP.This package provides the display driver for Microsoft Windows 2000 and Microsoft Windows XP users.Version 8.133.2-050525a-024243C-IBM, Driver version in Windows Device Manager, 6.14.10.6546 Windows XP, 6.14.10.6546 Windows 2000:# (Fix) When doing playback video clip with MediaPlayer in Theater mode at 32bit color depth on ThinkPad X31/32, the secondary display is flickering.# (New) Support 3D Stereo support on ATI MOBILITY FIREGL T2 model.This package enables or updates the display function of the following ThinkPad systems:# ThinkPad A31, A31p# ThinkPad R40, R40e# ThinkPad R50, R50p# ThinkPad R51 (Machine Type 1829, 1830, 1831, and 1836) (*1)# ThinkPad T30, T40, T40p, T41, T41p, T42, T42p# ThinkPad X31, X32Notes:# (*1) Machine Type 2883, 2887, 2888, 2889, 2894 and 2895 of ThinkPad R51 family are not supported.# This program is language independent and can be used with any language system.. |
| Download Link: |
Want this driver? Download DriverFinder to get the most updated drivers for your PC!
By choosing to install DriverFinder (264KB), I consent to the End User License Agreement and Privacy Policy of it's site.
|
|
|
 |
|
 |
|
| |
 |
Technology News |
 |
| |
In part two of a two-part series, Computer Weekly talks to 10 storage suppliers and a lawyer about the next frontier in data sovereignty – from AI model sovereignty to the sovereign SLAs that could redefine the storage market
The UK must integrate digital and energy planning, and treat compute as a flexible grid asset through evidence-based modular design rather than building isolated hyperscale hubs
Undersea cable built on coherent optics builds foundation for Indonesia’s expanding digital economy, connecting more than 250,000 premises in Indonesia with high-performance connectivity
Scotland forces councils to flag 50MW-plus datacentre bids to ministers within seven days, as mooted gigawatt campuses prove to be vapour or stall on grid connections
Driven by AI, soaring datacentre demands require a UK national community impact framework. It must balance growth with transparency, grid readiness, and ratepayer protection
UK digital infrastructure needs a strategic national plan that combines grid discipline, closed-loop cooling, circular hardware, and waste heat recovery to ensure resilience
|
|
 |
|
 |
|
|
|